Last month, a 7.35-acre homesite on a plateau in Ascaya closed for $14.7 million. The Las Vegas Review-Journal reported that property records name Raiders owner Mark Davis as the buyer and that the parcel has changed hands multiple times over the past several years. The parcel has been sold several times and still has no house on it.
That is how Ascaya trades. Homesites change hands often, and finished houses rarely do. For a buyer this year, the real choice is between three ways into the community, and each one asks you to wait for something different.
Four home sales, $40 million in land
Nevada State Bank's annual luxury report, which the Review-Journal covered in April, counted four Ascaya home sales in calendar year 2025. They averaged $10.1 million, the second-highest average price in Southern Nevada. The same report counted 517 luxury sales across Henderson in 2025, at an average price of $2.3 million.
Land moves at a different pace. Through the first quarter of 2026, Ascaya's developer reported $96.845 million in total sales activity. That included $40 million in homesite transactions and $17.275 million in home sales, and the home figure counts The Canyon Residences. Another $39.57 million was in escrow heading into the second quarter. Those are the developer's numbers. By them, three months of homesite sales came to about the same dollar total as the four finished-home sales the bank report counted for all of 2025, roughly $40 million each.
The construction pipeline shows the same thing from another angle. The development team said that as of April 2026 Ascaya had 92 completed homes, 31 under construction and 32 in architectural review. The Review-Journal describes the community as planned for more than 300 homes. Fewer than a third of the planned homes are built, and another 63 are being built or designed. A large share of what Ascaya will eventually become exists today as land and drawings.
Why the land keeps changing hands
The Review-Journal's report on last month's sale noted that it's not uncommon in Southern Nevada for a wealthy buyer to purchase a custom-home site, never build, and later sell the lot. Its example came from Summerlin's Summit Club, where a homesite bought for $6.5 million in 2018 sold this year for $18.15 million.
Ascaya's own top-end land shows the same pattern. The same buyer behind last month's $14.7 million purchase also bought four adjacent Cloud Rock lots in March for $38.75 million. The developer calls it the largest homesite purchase ever recorded in Las Vegas. The four lots cover more than 19 acres, but only about 7.6 of those acres can be built on. When the purchase closed, Davis told the Review-Journal that whether he builds one project or as many as four would be decided in time, and that there was no rush.
For a buyer, this means the competition for the best Ascaya land includes people with no plans to move in. A buyer who plans to build is bidding against buyers who are happy to wait.
Path one: a homesite, and two to three years
In June 2025 the developer released its last 58 developer-owned homesites as the Cloud Rock Collection. The lots ranged from 1.6 to 6.6 acres and were priced from $2 million to $18 million at release. By the developer's first-quarter 2026 update, a limited number of Cloud Rock lots remained, up to 3.14 acres and priced from $2 million. Estate homesites, from 0.4 to 2.65 acres, started at $1 million. Ascaya's homesites page currently lists Estate lots from $1 million and Cloud Rock lots from $2 million to $8 million, with featured listings asking between $1.599 million and $5.18 million.
The developer's own lots are close to gone, and the largest, highest Cloud Rock sites have mostly sold. More of the land a future buyer can choose from will therefore come from current owners reselling, and some of those owners, like the sellers of last month's parcel, will have held the land without building.
The lot price is where the wait begins. Ascaya development lead Sam Brown told the Review-Journal that hiring an architect, designing and building usually takes two to three years. Sun West Custom Homes, which built the 2025 New American Home at 7 Stoneshead Court, said a home of that caliber normally takes 18 to 24 months to build, according to the Review-Journal's coverage of the showcase home. Blue Heron CEO Tyler Jones has described Ascaya's design review as deliberate and focused on quality.
Lot owners do get access to the community right away. Ascaya says homesite owners can use the 23,000-square-foot Clubhouse with private dining, the zero-edge pool with Olympic-size lap lanes, the fitness and movement studios, the tennis and pickleball pavilion and the two-acre Family Park while their home is designed and built. For a buyer who lives elsewhere during the build, that access lets them use the community years before their house is finished.
Path two: a finished custom home, when one is available
Finished custom homes are the scarcest of the three options. The four 2025 sales in the bank report averaged eight figures. The Review-Journal reported that 3 Stoneshead Court, a 10,459-square-foot home, sold for $16.25 million in March 2025, the top luxury sale in the valley that month. A separate Review-Journal roundup listed its asking price at $16.5 million. Sun West's New American Home next door at 7 Stoneshead Court was listed at $15.499 million in February 2025.
Asking prices on new finished homes do move. The Desert Design Study home at 11 Chisel Crest Court, designed by studio g ARCHITECTURE, was offered at $11.6 million in October 2025. Ascaya's homes page now shows it at $10.825 million. A buyer who wants a finished custom home is shopping in a very small pool. When only a handful of comparable sales close in a year, the price of any single home depends far more on that particular house than on a neighborhood average.
Path three: The Canyon Residences, ready now
The Canyon Residences cut the wait to almost nothing. Blue Heron designed and built 51 condominium residences across seven terraces in three types, Garden, Villa and Penthouse. All are single-level, with three or four bedrooms and 3,391 to 4,859 square feet. The Canyon has five pool terraces, two wellness parks with saunas and cold plunges, and a trail loop that connects to Ascaya's wider trail network. Its residents also have full use of the Clubhouse.
Ascaya reports that Terrace Three is complete, with four model homes and a limited number of residences ready for move-in. Terrace Four is also complete, with three Garden and three Penthouse residences. The developer's availability list currently shows seven residences for sale, from $2.958 million for Garden Residences at 4 and 10 Harlow View Court to $4.459 million for Villa Residence 14 at 6 Kaya Canyon Way. Three are marked sold, including Garden Residence 21 at 14 Harlow View Court, which Ascaya says closed after being offered at $3.04 million.
That list is a snapshot and can change week to week. Even so, The Canyon is the only part of Ascaya where several finished homes are for sale at once, with published prices and similar floor plans that can be compared directly. Its starting price is close to the lot price on some Cloud Rock land, and it comes with no design review and no two-to-three-year build.
The wider market these choices sit in
Across the Valley, the market is cooling. The Review-Journal reported this month that Las Vegas pending home sales fell 20.6% year over year in the four weeks ending Oct. 18. In Henderson's luxury segment, results were already uneven last year. McCullough Hills recorded 16 sales in 2025, down from 52 in 2024.
Ascaya's land sales have stayed strong through that slowdown, from the record March assemblage to last month's $14.7 million closing. Land in Ascaya keeps finding buyers who are content to hold it. Buyers who need to move in on a set date have the smaller supply. For anyone weighing Ascaya against other Henderson luxury communities, our read on MacDonald Highlands' two separate markets shows how much product type can split the numbers in a single ZIP code.
FAQ
How many homesites are left in Ascaya? The developer's 2026 update describes a limited number of Cloud Rock lots remaining from $2 million and Estate homesites from $1 million.
How long does it take to build after buying a lot? Ascaya development lead Sam Brown has put the process from hiring an architect through completion at two to three years.
What is the fastest way to live in Ascaya? A completed residence at The Canyon Residences, where the developer lists move-in-ready homes from $2.958 million, or a finished custom home when one comes on the market.
Where is Ascaya? Off Horizon Ridge Parkway east of Green Valley Parkway in Henderson, in the McCullough Range next to the Sloan Canyon National Conservation Area.
If you're deciding between an Ascaya homesite, a finished custom home and a residence at The Canyon, the right choice depends on your timeline as much as your budget. Davidson Real Estate Group can compare the lots, resales and Canyon floor plans available now against your move-in date and walk you through what each one will take. Schedule a free consultation to start with the options that fit your timeline.